The Evolution of the Fourth Dynasty Pyramids · Chapter 9
A Major Delay in Construction
From an Engineer’s Perspective
Hiroyuki Nagase · 2026 · Book pages 141–153
From The Evolution of the Fourth Dynasty Pyramids: From an Engineer’s Perspective
ISBN 978-4911207901
About this chapter
How long did Khufu’s pyramid take to build, and was it actually finished during his lifetime? Chapter 9 examines these questions from the standpoint of project schedules, the sequence of construction work, and the physical condition of the monument. Nagase argues that the completion of a royal pyramid cannot be equated simply with the placement of the last core masonry block: finishing the casing, dismantling temporary ramps and scaffolds, and handing over a functioning funerary monument were also essential stages.
The chapter compares competing interpretations of Khufu’s reign and construction chronology. Pierre Tallet’s interpretation of the Diary of Merer has been associated with Year 27, using a biennial cattle-count assumption; Zahi Hawass has argued for Year 17 on other grounds. Nagase questions the evidentiary basis of both dates and, in particular, cautions that the surviving diary does not explicitly identify its cargo as Tura limestone casing stones. He also distinguishes an ancient date recorded in a document from a demonstrated date of pyramid completion.
The unfinished-pyramid hypothesis
Nagase proposes that the project may have experienced major delays caused by extensive structural precautions, changes to the internal design, and the difficulty of sustaining a massive construction enterprise. A construction target of roughly ten to fifteen years is considered as a project-management possibility, not a date established by ancient records. The resulting question is whether Khufu died before the builders completed all the work required to make the pyramid a finished monument.
Particular attention is given to the summit of the Great Pyramid. Early photographs and nineteenth-century illustrations show irregular blocks above the uppermost clearly completed course. Nagase argues that this condition deserves to be evaluated as possible evidence that masonry was interrupted, rather than automatically attributed to later stone removal or collapse. He acknowledges alternative explanations while considering what each would require.
What counts as completion?
Using the construction-phase and workforce model developed in Chapter 6, the chapter separates completion of the core from the subsequent finishing and dismantling stages. If the spiral ramp and mudbrick scaffolding still surrounded the pyramid, the monument would not yet have presented the finished form familiar today. Nagase therefore asks whether a project in that state could have been ceremonially transferred for funerary use.
The author's conclusion is explicitly a historical and engineering hypothesis: the available evidence, as he reads it, allows the possibility that Khufu’s pyramid was never fully completed during the king’s lifetime. This premise is developed further in subsequent chapters on Djedefre and Khafre.
Column 5: Royal names preserved on stone
An accompanying column reexamines royal-name inscriptions recorded by Lepsius, comparing variants of Khufu’s name and the possibility that some construction marks were copied by workers who recognized shapes without reading the hieroglyphs fluently. It distinguishes the ability to use numbers and practical marks from full literacy, adding a different perspective on the people who actually built the pyramids.
Topics covered
- Uncertainties in Khufu’s regnal chronology and the cattle-count interpretation
- What the Diary of Merer does—and does not—directly establish about cargo and dates
- Proposed original schedules versus possible delays in constructing the Great Pyramid
- Early photographic evidence for the condition of the pyramid’s summit
- Core masonry, casing-stone finishing, scaffold removal, and ritual handover as separate milestones
- The unfinished-pyramid hypothesis and its implications for Djedefre’s succession
- Column 5: variants of Khufu’s royal name, construction marks, and practical literacy
Read the chapter
The PDF reproduces book pages 141–153, including historical summit photographs, construction-phase diagrams, and Column 5.
Read Chapter 9 (PDF, 13 pages)