The Evolution of the Fourth Dynasty Pyramids · Chapter 7

The Three Large Pyramids of King Sneferu

From an Engineer’s Perspective

Hiroyuki Nagase · 2026 · Book pages 105–122
From The Evolution of the Fourth Dynasty Pyramids: From an Engineer’s Perspective
ISBN 978-4911207901

About this chapter

Why did King Sneferu undertake three exceptionally large pyramid projects, and how could they have been built within a reign conventionally estimated at 24 years? This chapter examines the pyramids at Meidum and Dahshur not as a smooth sequence of technical improvements, but as major construction projects marked by design revisions, structural difficulties, changing priorities, and opportunities to transfer experienced workers between sites.

The discussion begins with the Meidum Pyramid, originally a step pyramid that was transformed into a true pyramid. Nagase considers the significance of this transition for construction methods and the possibility that the deterioration of the monument influenced later projects. The chapter then turns to the Bent Pyramid at Dahshur. Its conspicuous change in slope, from approximately 54° to 43°, is interpreted as a response to structural instability rather than a planned aesthetic feature. The simultaneous change from inward-leaning masonry to horizontal courses is considered as an engineering decision intended to reduce potentially harmful concentrations of load.

In the Red Pyramid, the gentler angle and horizontal masonry of the Bent Pyramid’s upper section were retained. Nagase reads this continuity as evidence of a cautious design philosophy: builders adopted a method they had reason to regard as safer, even though it resulted in a broad, relatively low-profile monument. Differences in the form of the masonry blocks are also examined using photographs taken at the sites.

The final section revisits the problem of Sneferu’s reign length. Rather than extending the reign to 48 years simply because three large pyramids seem difficult to complete in 24, Nagase asks whether their construction phases could have overlapped. The project-management model developed in Chapter 6 distinguishes core masonry and ramp construction from the later finishing of casing stones and dismantling of temporary structures. Workers could therefore have moved to a new project while an earlier pyramid entered a less labor-intensive stage. The chapter treats parallel construction as a possible explanation, not as an established chronology.

It also raises the possibility that the upper casing of the Red Pyramid was never completed, an issue explored further elsewhere in the book.

Column 4: Cattle counts and regnal years

An accompanying column questions whether the ancient Egyptian date formula “the year after the 13th cattle count” necessarily identifies Khufu’s 27th regnal year. The argument distinguishes the timing of the cattle count from the beginning of a calendar year and asks whether a biennial count can safely be assumed. It discusses earlier scholarly caution, including observations by William S. Smith, and concludes that the inscription alone does not establish a unique regnal-year number.

Topics covered

Read the chapter

The PDF reproduces book pages 105–122, including diagrams, comparison tables, photographs, and Column 4.

Read Chapter 7 (PDF, 18 pages)

Previous: Chapter 6 — Considering the Construction Process of the Pyramid

Next: Chapter 8 — Khufu's Pyramid: The Return to a Steep Angle