The Evolution of the Fourth Dynasty Pyramids · Chapter 5
Rethinking the Construction Slopes of the True Pyramid
From an Engineer’s Perspective
Hiroyuki Nagase · 2026 · Book pages 67–91
From The Evolution of the Fourth Dynasty Pyramids: From an Engineer’s Perspective
ISBN 978-4911207901
About this chapter
Many proposals for pyramid construction ramps concentrate on how stone blocks could be raised to the required height. This chapter begins with a different problem: workers also needed sufficient, stable space to set the masonry and install the exterior casing. A ramp that can deliver a stone is not necessarily a complete construction system. Nagase therefore treats transport routes and working scaffolds as related but distinct facilities.
The chapter first revisits the Third Dynasty Step Pyramid, whose wide terraces could have accommodated working platforms and switchback ramps. The conversion to a true pyramid under Sneferu changed the engineering problem: the continuous sloping exterior offered no comparable terraces. To address this, Nagase proposes a double-helix loop consisting of mudbrick working scaffolding around the casing and a separate circumferential transport ramp immediately outside it. The chapter critically examines timber-scaffold illustrations and internal-ramp proposals, focusing on whether their construction sequence and daily stone throughput would actually be feasible.
The quantities involved are substantial. For Khufu’s pyramid, the proposed system is provisionally estimated to require about 340,000 m³ of mudbrick for scaffolding and 340,000 m³ for ramps, a combined 680,000 m³, equivalent to roughly 151 million sun-dried bricks. The brick production rate estimated in Chapter 1 makes this immense quantity conceivable over several years. The more difficult question becomes where the raw Nile mud could have been obtained. Nagase connects this material requirement with the excavation of the basin identified as Khufu Lake and the dredging of Khufu Harbor, proposing that harbor works and mudbrick production might have formed an integrated civil-engineering operation. This is a reconstruction, not an archaeologically established account.
The proposed ramp also has to turn around each pyramid corner. The chapter discusses road cant (superelevation) and tapered rollers as possible aids to turning heavy stones. It compares the behavior of rollers and sledges on inclines and examines the danger of uncontrolled downhill movement. For placing blocks precisely, Nagase offers another unusual possibility: using temporary sun-dried mudbrick supports that soften when wetted, allowing a stone to settle gradually into position. He explicitly acknowledges that this placement method is hypothetical.
Finally, the chapter develops a numerical model for the Great Pyramid. Assuming a rise of four masonry courses along each side, the ramp would complete approximately 12.7 circuits around the pyramid, with a total path length of about 6.2 km and a gradient of roughly 2.5%. The key question is not simply whether a stone can be moved upward once, but whether the ramp could sustain the production system introduced in Chapter 2: approximately 500 blocks per working day. Segmented relay teams, modest pulling forces, and a gentle gradient are central to the proposal. The figures are engineering estimates based on the author's stated assumptions.
Topics covered
- Step-pyramid terraces, masonry working space, scaffolding, and switchback ramps
- The proposed double-helix loop: external circumferential ramp plus mudbrick scaffolding
- Construction-sequence problems with timber scaffolds and other ramp hypotheses
- An estimate of 680,000 m³ of mudbrick (about 151 million bricks) for Khufu’s ramps and scaffolds
- Khufu Harbor, Khufu Lake, dredging spoil, and possible sources of mud for brickmaking
- Cornering heavy loads using superelevation, tapered rollers, and roller transport
- A hypothetical water-softened mudbrick support for lowering blocks into position
- Khufu’s 203 courses, 12.7 circuits, 6.2 km ramp, 2.5% grade, and sustainable transport throughput
Read Chapter 5 (PDF, 25 pages)
The PDF reproduces book pages 67–91, including design diagrams, numerical estimates, and proposed construction procedures.